Water Proofing not done. I have escalated this many times. From September 2014 I am continuously following up. Informed to site engineer Manjunath, Mr. Vikram Prabhakar, Mr. Manjunath and Boniface (facility management services) of Vikram Structures Pvt. Ltd. They came for doing the measurement. After that, no progress. Every time the site engineer keeps telling some reason. The rain water seeps through the walls and the paint on the wall goes away. I had lot of trouble painting the house. Now, almost 9 months got over, and still it is not done.
Wednesday, July 22, 2015
Water Proofing not done at VSPL
Facility Committed: Building Structure made of RCC frame work with concrete block masonry walls & Water proof treatment done for sunken RCC slab.
Water Proofing not done. I have escalated this many times. From September 2014 I am continuously following up. Informed to site engineer Manjunath, Mr. Vikram Prabhakar, Mr. Manjunath and Boniface (facility management services) of Vikram Structures Pvt. Ltd. They came for doing the measurement. After that, no progress. Every time the site engineer keeps telling some reason. The rain water seeps through the walls and the paint on the wall goes away. I had lot of trouble painting the house. Now, almost 9 months got over, and still it is not done.
Water Proofing not done. I have escalated this many times. From September 2014 I am continuously following up. Informed to site engineer Manjunath, Mr. Vikram Prabhakar, Mr. Manjunath and Boniface (facility management services) of Vikram Structures Pvt. Ltd. They came for doing the measurement. After that, no progress. Every time the site engineer keeps telling some reason. The rain water seeps through the walls and the paint on the wall goes away. I had lot of trouble painting the house. Now, almost 9 months got over, and still it is not done.
Subscribe to:
Post Comments (Atom)


No comments:
Post a Comment